Customer:
Karmayogi Shankarraoji Patil Sahakari Sakhar Karkhana Ltd
Project Category:
Industrial – Co-operative Sugar Factory
Customer Requirement:
The client required a 6300 Amp LT Main PCC Panel capable of distributing and controlling power across the entire sugar production plant. The system had to be designed for large current capacity, fault protection, and future expansion capability. The client emphasized load reliability, safety, and compliance with electrical standards.
Project Result:
The sugar plant achieved stable and centralized power control Reduced downtime due to well-structured feeder management Achieved high power efficiency and fault tolerance System is still in smooth operation with minimal maintenance issues
What we did:
Designed and built a custom 6300 Amp LT Main PCC Panel with: Segregated compartments for incomer and outgoing feeders High-quality copper busbars and ACBs for main load circuits Advanced protection system including relays and metering instruments. Ensured on-time delivery, on-site testing, and technical support during commissioning
Project Description
Shree Engineering executed the complete design, fabrication, and commissioning of a 6300 Amp LT Main Power Control Center (PCC) Panel for Karmayogi Sugar Factory. Built for industrial-grade usage, the panel was structured for reliability, safety, and future scalability. Our involvement helped optimize the electrical distribution system for the entire plant, ensuring long-term performance and client satisfaction.
Project Budget:
Completion Date:
2011-02-13T00:00:00
